Refined By:
Fulltext:  No Fulltext
Type:  Conference Papers

Results 21-39 of 39 (Search time: 0.003 seconds).

Issue DateTitleAuthor(s)
212010Research and training challenges within SmartEN Marie Curie ITNOnoufriou, Toula ; Tantele, Elia ; Hadjimitsis, Diofantos G. ; Chrysostomou, Christis 
222010Optimization of life-cycle preventative maintenance strategies using genetic algorithm and Bayesian UpdatingTantele, Elia ; Onoufriou, Toula 
231-Dec-2008Effect of corrosion on the reliability of a bridge based on Response Surface MethodJo, S. I. ; Onoufriou, Toula ; Crocombe, A. D. 
241-Dec-2008A risk ranking strategy for network level bridge managementSathananthan, S. ; Rafiq, Meena Imran ; Onoufriou, Toula 
2529-Jun-2008Remote sensing measurements and GIS application for evaluation of air pollution in an industrial area in Limassol, CyprusHadjimitsis, Diofantos G. ; Themistokleous, Kyriacos ; Onoufriou, Toula 
262006Predictive SHM-supported deterioration modelling of reinforced concrete bridgesOnoufriou, Toula ; Rafiq, Meena Imran ; Chryssanthopoulos, Marios K. 
272006Optimization of preventative maintenance strategies for bridgesTantele, Elia ; Onoufriou, Toula ; Mulheron, Mike J. 
282005Comparison of bridge mamagememt strategies using life-cycle cost analysisOnoufriou, Toula ; Rafiq, Meena Imran ; Chryssanthopoulos, Marios K. 
292005Application of risk and reliability to the management of bridgesOnoufriou, Toula ; Pardi, L. ; Shetty, N. 
302005System reliability-based bridge assessment using the response surface methodOnoufriou, Toula ; Jo, SungIl ; Crocombe, Andrew D. 
312005Effectiveness of preventative maintenance for reinforced concrete bridges - A stochastic approachTantele, Elia ; Onoufriou, Toula ; Mulheron, Mike J. 
322004Aspects of modelling uncertainty in predicting chloride induced deterioration for concrete bridgesRafiq, Meena Imran ; Chryssanthopoulos, Marios K. ; Onoufriou, Toula 
332004A Systems Updating Approach For Proactive Health Monitoring Of Concrete BridgesRafiq, Meena Imran ; Chryssanthopoulos, Marios K. ; Onoufriou, Toula 
341-Dec-2003Performance Updating of Concrete Bridges Through Proactive Health Monitoring MethodsRafiq, Meena Imran ; Chryssanthopoulos, Marios K. ; Onoufriou, Toula 
352002Reliability-based importance assessment of structural members with applications to complex structuresOnoufriou, Toula ; Gharaibeh, Emhaidy S. ; Frangopol, D.M. 
361-Jan-1996Reliability based inspection planning applications for offshore structuresOnoufriou, Toula 
371996Review of jack-up inspection and repair practiceOnoufriou, Toula ; Dixon, Alan 
381-Jan-1995Reliability based inspection scheduling of floatersOnoufriou, Toula ; Simpson, R. J. ; Protopapa, M. 
391994Reliability based optimised inspection planningOnoufriou, Toula ; Fowler, D ; Smith, J.K.