Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.14279/9402
Title: Building Information Modelling (BIM) and Unmanned Aerial Vehicle (UAV) technologies in infrastructure construction project management and delay and disruption analysis
Authors: Vacanas, Yiannis 
Themistocleous, Kyriacos 
Agapiou, Athos 
Hadjimitsis, Diofantos G. 
metadata.dc.contributor.other: Βακανάς, Γιάννης
Θεμιστοκλέους, Κυριάκος
Αγαπίου, Άθως
Χατζημιτσής, Διόφαντος
Major Field of Science: Engineering and Technology
Field Category: Mechanical Engineering
Keywords: BIM;Delay;Disruption;Programme;Project management;Records;Schedule;Time;UAV
Issue Date: 1-Jan-2015
Source: 3rd International Conference on Remote Sensing and Geoinformation of the Environment, RSCy 2015; Paphos; Cyprus; 16 March 2015 through 19 March 2015
DOI: 10.1117/12.2192723
Abstract: Time in infrastructure construction projects has always been a fundamental issue as early as from the inception of a project, during the construction process and often after the completion and delivery. In a typical construction contract time related matters such as the completion date and possible delays are among the most important issues that are dealt with by the contract provisions. In the event of delay there are usually provisions for extension of time award to the contractor with possible reimbursement for the extra cost and expenses caused by this extension of time to the contract duration. In the case the contractor is not entitled to extension of time, the owner will be possibly entitled to amounts as compensation for the time prohibited from using his development. Even in the event of completion within the time agreed, under certain circumstances a contractor may have claims for reimbursement for extra costs incurred due to induced acceleration measures he had to take in order to mitigate disruption effects caused to the progress of the works by the owner or his representatives. Depending on the size of the project and the agreement amount, these reimbursement sums may be extremely high. Therefore innovative methods with the exploitation of new technologies for effective project management for the avoidance of delays, delay analysis and mitigation measures are essential; moreover, methods for collecting efficiently information during the construction process so that disputes regarding time are avoided or resolved in a quick and fair manner are required. This paper explores the state of art for existing use of Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) technologies in the construction industry in general. Moreover the paper considers the prospect of using BIM technology in conjunction with the use of UAV technology for efficient and accurate as-built data collection and illustration of the works progress during an infrastructure construction project in order to achieve more effective project management, record keeping and delay analysis.
URI: https://hdl.handle.net/20.500.14279/9402
ISBN: 978-162841700-5
Rights: © 2015 Copyright SPIE.
Type: Conference Papers
Affiliation : Cyprus University of Technology 
Appears in Collections:Δημοσιεύσεις σε συνέδρια /Conference papers or poster or presentation

CORE Recommender
Show full item record

Page view(s) 5

545
Last Week
3
Last month
34
checked on Apr 27, 2024

Google ScholarTM

Check

Altmetric


Items in KTISIS are protected by copyright, with all rights reserved, unless otherwise indicated.