| | Issue Date | Title | Author(s) |
| 21 | 2010 | Wireless sensor technology for continuous health monitoring of structures | Onoufriou, Toula ; Kounoudes, Anastasis ; Kalis, Antonis ; Constantinides, Anthony G. |
| 22 | 2010 | Research and training challenges within SmartEN Marie Curie ITN | Onoufriou, Toula ; Tantele, Elia ; Hadjimitsis, Diofantos G. ; Chrysostomou, Christis |
| 3 | 2010 | Optimization of life-cycle preventative maintenance strategies using genetic algorithm and Bayesian Updating | Tantele, Elia ; Onoufriou, Toula |
| 4 | 1-Dec-2008 | Effect of corrosion on the reliability of a bridge based on Response Surface Method | Jo, S. I. ; Onoufriou, Toula ; Crocombe, A. D. |
| 5 | 1-Dec-2008 | A risk ranking strategy for network level bridge management | Sathananthan, S. ; Rafiq, Meena Imran ; Onoufriou, Toula |
| 6 | 29-Jun-2008 | Remote sensing measurements and GIS application for evaluation of air pollution in an industrial area in Limassol, Cyprus | Hadjimitsis, Diofantos G. ; Themistokleous, Kyriacos ; Onoufriou, Toula |
| 7 | 2006 | Predictive SHM-supported deterioration modelling of reinforced concrete bridges | Onoufriou, Toula ; Rafiq, Meena Imran ; Chryssanthopoulos, Marios K. |
| 8 | 2006 | Optimization of preventative maintenance strategies for bridges | Tantele, Elia ; Onoufriou, Toula ; Mulheron, Mike J. |
| 9 | 2005 | Comparison of bridge mamagememt strategies using life-cycle cost analysis | Onoufriou, Toula ; Rafiq, Meena Imran ; Chryssanthopoulos, Marios K. |
| 10 | 2005 | Application of risk and reliability to the management of bridges | Onoufriou, Toula ; Pardi, L. ; Shetty, N. |
| 11 | 2005 | System reliability-based bridge assessment using the response surface method | Onoufriou, Toula ; Jo, SungIl ; Crocombe, Andrew D. |
| 12 | 2005 | Effectiveness of preventative maintenance for reinforced concrete bridges - A stochastic approach | Tantele, Elia ; Onoufriou, Toula ; Mulheron, Mike J. |
| 13 | 2004 | Aspects of modelling uncertainty in predicting chloride induced deterioration for concrete bridges | Rafiq, Meena Imran ; Chryssanthopoulos, Marios K. ; Onoufriou, Toula |
| 14 | 2004 | A Systems Updating Approach For Proactive Health Monitoring Of Concrete Bridges | Rafiq, Meena Imran ; Chryssanthopoulos, Marios K. ; Onoufriou, Toula |
| 15 | 1-Dec-2003 | Performance Updating of Concrete Bridges Through Proactive Health Monitoring Methods | Rafiq, Meena Imran ; Chryssanthopoulos, Marios K. ; Onoufriou, Toula |
| 16 | 2002 | Reliability-based importance assessment of structural members with applications to complex structures | Onoufriou, Toula ; Gharaibeh, Emhaidy S. ; Frangopol, D.M. |
| 17 | 1-Jan-1996 | Reliability based inspection planning applications for offshore structures | Onoufriou, Toula |
| 18 | 1996 | Review of jack-up inspection and repair practice | Onoufriou, Toula ; Dixon, Alan |
| 19 | 1-Jan-1995 | Reliability based inspection scheduling of floaters | Onoufriou, Toula ; Simpson, R. J. ; Protopapa, M. |
| 20 | 1994 | Reliability based optimised inspection planning | Onoufriou, Toula ; Fowler, D ; Smith, J.K. |